Berkomunikasi dengan pemasok? Pemasok
Richard SHEN Mr. Richard SHEN
Apa yang dapat saya lakukan untuk Anda?
Ngobrol Hubungi pemasok
 Tel:86-574-88255925 Email:sales@steel-tubes.com
Beranda > Produk > Tabung Baja DOM > TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube
  • TORICH BS6323-6 Cold Finished ERW DOM Steel Tube

TORICH BS6323-6 Cold Finished ERW DOM Steel Tube

    Harga satuan: USD 600 / Ton
    Jenis pembayaran: L/C,T/T,D/P,Paypal,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,FCA,CPT
    Min. Memesan: 5 Ton
    Waktu pengiriman: 30 Hari

Info dasar

Model No: BS6323-6

Additional Info

Kemasan: DOM Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

Produktivitas: 20000 tons/year

Merek: TORICH

Transportasi: Ocean,Land,Air

Tempat asal: China (Zhejiang)

Kemampuan Supply: 5000Tons per Year

Sertifikat: ISO9001,ISO14001,TS16949

Pelabuhan: Shanghai,Ningbo

Deskripsi Produk

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube

Product Description:

Standard: BS6323-6

Size Range: OD: 6-350mm
WT: 1-35mm

Length: max 12000mm

Steel Grade: CEW1a CEW2a CEW3a CEW4a CEW5a

Delivery Condition:

1 BK Cold finished(hard)

2 BKW Cold finished(soft)

3 GBK Annealed

4 NBK Normalized

5 GZF Annealed (including de-scaling)

6 NZF Normalized (including de-scaling)


Product Pictures:

IMG_0532PIC_20161202_150109_47C

Packing:

Steel Tube Container PackingPacking In Hexagon Bundle

Characteristic:

Good concentricity

Good OD and ID tolerance

High precision

Stable quality

Smooth roughness

DOM Steel Tube Production Process:

Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage


Torich's Chemical assurance
1.Each lot of raw materials will be tested by spectrometer before put in storage.
2.100%PMI the mother pipe to ensure we put right material.
2.100%PMI the finished pipe again to ensure we produced right grade

Heat Treatment Assurance

A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.



FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube



Kategori Produk : Tabung Baja DOM

Email ke pemasok ini
  • Mr. Richard SHEN
  • Pesan Anda harus antara 20-8000 karakter

Daftar Produk Terkait

Rumah

Phone

Skype

Permintaan